Comparison of Reinforcement Waste of Columns and Beams in the Ditsamapta Building North Sumatra Regional Police Using Conventional Method and COP

  • Kevin Ghozali Departement of Civil Engineering Politeknik Negeri Medan
  • Agung Nur Wahid Btr Politeknik Negeri Medan
  • Rhini Wulan Dary Departement of Civil Engineering Politeknik Negeri Medan
Keywords: Waste, Reinforcement Steel, Bar Bending Schedule, Cutting Optimization Pro Software, Column and Beam

Abstract

Material is one of the most important resources in construction projects, contributing 40–60% of the total cost. Reinforcing steel often leaves excess material due to cutting errors, so optimization is needed to minimize waste. This study aims to compare waste calculation using the conventional method and Cutting Optimization Pro (COP) software through a bar bending schedule. The results show that the conventional method produced waste of Ø8 14.102%, Ø10 9.480%, D10 8.385%, D12 10.444%, and D16 9.500%. With COP, the waste decreased to Ø8 2.888%, Ø10 1.855%, D10 8.087%, D12 6.980%, and D16 5.756%. Overall, the use of COP was able to reduce waste by about 5% compared to the conventional method.

Downloads

Download data is not yet available.

References

Agus Heri Yunial, “Waterfall Method In Designing A Web-Based Waste Payment Information System (Case Study: Calincing Bukit Valley Housing Rt04/Rw008),” J. Inotera, vol. 9, no. 1, pp. 226–232, 2024, doi: 10.31572/inotera.vol9.iss1.2024.id336.

G. Imam Gunadi, Taufik Nur Isman, Ridwan Alawi, A. H. Tambunan, Prawoto, and Eka Maulana, “Study of the Potential of Refuse Derived Fuel (RDF) at the Cipayung Final Disposal Site (TPA) to Meet Industrial Quality Standards and Environmentally Friendly,” J. Inotera, vol. 8, no. 1, pp. 73–81, 2023, doi: 10.31572/inotera.vol8.iss1.2023.id217.

S. Cutting and O. Pro, “T e k n o,” vol. 22, no. 87, 2024.

F. Najwa, A. Miranty, and R. W. Dary, “Perhitungan Waste Tulangan Pada Struktur Atas Pembangunan Pajak Tavip Kota Binjai,” pp. 1083–1094, 2024.

I. A. P. S. Mahapatni, I. W. Artana, M. N. Indriani, and N. M. Y. Praptaningsih, “Perbandingan waste besi tulangan pelaksanaan proyek konstruksi dengan perhitungan bar bending schedule (studi kasus: proyek pembangunan M&G Villa, Jalan Pantai Berawa, Canggu, Kecamatan Kuta Utara, Kabupaten Badung – Bali),” Padur. J. Tek. Sipil Univ. Warmadewa, vol. 13, no. 2, pp. 199–203, 2024, doi: 10.22225/pd.13.2.10672.199-203.

I. G. Ngurah, E. Partama, I. G. Made, E. Louis, and B. Saputra, “ANALISIS SISA BESI TULANGAN MENGGUNAKAN SOFTWARE CUTTING OPTIMIZATION PRO PADA KONSTRUKSI GEDUNG,” vol. 15, no. 02, pp. 30–38, 2023.

S. U. Dewi and E. Suryamandala, “Studi Perhitungan Kebutuhan dan Pemanfaatan Sisa Tulangan Kolom dalam Konstruksi Gedung dengan Cutting Optimization Pro (COP),” Tek. Sains J. Ilmu Tek., vol. 10, no. 1, pp. 58–67, 2025, doi: 10.24967/teksis.v10i1.3940.

I. W. Muka, M. A. Widyatmika, and I. M. N. Antara, “Analisis Perbandingan Waste Besi Tulangan Metode Konvensional Dengan Software Cutting Optimazation Pro,” Teknika, vol. 15, no. 2, p. 41, 2020, doi: 10.26623/teknika.v15i2.2852.

I. N. D. K. Dewi, A. Muhammad, W. N. Achmadin, Andrie, M. N. Helsinky, and W. Aprillia, “Feasibility Analysis of Industrial-Scale Pyrolysis of 200 kg Polyethylene and Polystyrene Plastic Waste,” J. Inotera, vol. 10, no. 1, pp. 181–190, 2025, doi: 10.31572/inotera.vol10.iss1.2025.id461.

B. A. Dani and H. T. Tjendani, “Analisis Waste Material Besi Tulangan Pekerjaan Pondasi Mengunakan Metode Bar Bending Schedule pada Proyek Perumahan Grand Salt Village Sarirogo - Sidoarjo,” Portal J. Tek. Sipil, vol. 16, no. 1, p. 136, 2024, doi: 10.30811/portal.v16i1.4888.

M. A. D. Bastari, H. R. Husni, B. Bayzoni, and A. Ashruri, “Analisis Waste Material Tulangan Pelat Menggunakan Building Information Modeling (BIM) Pada Proyek Pembangunan SMPN 41 Bandar Lampung,” J. Rekayasa Sipil dan Desain, vol. 12, no. 1, pp. 65–76, 2024, doi: 10.23960/jrsdd.v12i1.4481.

Published
2026-03-09
How to Cite
[1]
Kevin Ghozali, A. Nur Wahid Btr, and Rhini Wulan Dary, “Comparison of Reinforcement Waste of Columns and Beams in the Ditsamapta Building North Sumatra Regional Police Using Conventional Method and COP”, JI, vol. 11, no. 1, pp. 129-138, Mar. 2026.