Quality Improvement Project Selection Using Fuzzy AHP and TOPSIS to Support Lean Six Sigma at PT ABC

  • Emi Rusmiati Politeknik STMI Jakarta
  • Siti Aisyah Politeknik STMI Jakarta
  • Laksmi Ambarwati Politeknik STMI Jakarta
Keywords: Fuzzy, AHP, TOPSIS, MCDM, Quality

Abstract

This research aims to improve project quality at PT ABC by integrating the Fuzzy Analytical Hierarchy Process (F-AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) within the Lean Six Sigma framework. This method assesses and selects quality improvement projects by considering uncertainty and complexity in decision-making. The Fuzzy AHP approach is used to flexibly assign criteria weights, while TOPSIS is used to rank projects based on performance scores relative to the ideal solution. This research aims to select the most suitable Lean Six Sigma project using the MCDM fuzzy AHP and TOPSIS approaches at PT ABC. There are three alternative quality improvement projects and three assessment criteria. The data processing results using Fuzzy AHP and TOPSIS showed that the most influential criterion was the impact criterion, with a value of 0.665. Overall, the order of influencing criteria is cost (0.260) and time (0.075). Based on a review of all criteria, the project to increase the drive plate production line (A) capacity was ranked first with a value of 0.772. Second place is the project to increase capacity and consolidate rear axle assemblies A and B with a value of 0.5529. Finally, the third is the process innovation and integrated manufacturing project to strengthen the business with a value of 0.4053.

Downloads

Download data is not yet available.

References

D. Seth dan D. Tripathi, “A Critical Study of TQM and TPM Approaches on Business Performance of Indian Manufacturing Industry,” Total Quality Management & Business Excellence, vol. 17, no. 7, pp. 811-824. doi.org/10.1080/14783360600595203, 2006.

R. Z. Tsaqif, S. Ali dan M. Marbun, “Ripple Mill Machine Damage Analysis Using the FMEA Method at the PT Argo Sinergi Nusantara Palm Oil Factory,” Jurnal Inovasi Teknologi dan Rekayasa , vol. 9, no. 1, pp. 8-14, 2024.

L. M. Sanches Jr, M. S. Filho dan G. F. Batalha, “Automotive body-in-white dimensional stability through pre-control application in the subassembly process,” Journal of Achievements in Materials and Manufacturing Engineering, vol. 31, no. 2, pp. 705-711, 2008.

V. Shukla, V. Swarnakar dan A. R. Singh, “Prioritization of Lean Six Sigma Project Selection Criteria Using Best Worst Method,” Materialstoday : Proceedings, vol. 47, no. 17, pp. 5749-5754. doi.org/10.1016/j.matpr.2021.04.038, 2021.

S. Vinodh dan V. Swarnakar, “Lean Six Sigma Project Selection Using Hybrid Approach Based on Fuzzy DEMATEL–ANP–TOPSIS,” International Journal of Lean Six Sigma, vol. 6, no. 4, pp. 313-338. DOI 10.1108/IJLSS-12-2014-0041, 2015.

M. B. Kumar, R. Parameshwaran, J. Antony dan E. Cudney, “ Framework for Lean Implementation Through Fuzzy AHP-COPRAS Integrated Approach,” IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, vol. 70, no. 11, pp. 3836-3848, 2023.

R. Sindhwani, O. S. Vaidya, J. Antony dan A. Shokri, “Evaluating Performance of Projects Using Six Sigma Approach,” IEEE TRANSACTIONS ONENGINEERINGMANAGEMENT, vol. 70, no. 10, pp. 3539-3552, 2023.

M. Zarghami dan F. Szidarovszky, “Revising the OWA Operator for Multi Criteria Decision Making Problems Under Uncertainty,” European Journal of Operational Research, vol. 198, no. 1, pp. 259-265. Doi:10.1016/j.ejor.2008.09.014, 2009.

M. Sequeira, A. Adlemo dan P. Hilletofth, “ A Hybrid Fuzzy AHP TOPSIS Model for Evaluation of Manufacturing Relocation Decisions,” Operations Management Researc, vol. 16, pp. 164-191. Doi: 10.1007/s12063-022-00284-6, 2023.

H. Auoag dan M. Soltani, “ Improvement of Lean Manufacturing Approach Based on MCDM Techniques for Sustainable Manufacturing,” International Journal of Manufacturing Research, vol. 18, no. 1, pp. 50-74. DOI: 10.1504/IJMR.2023.10040708, 2023.

D. Rahmayanti, Y. Meuthia, J. Albin dan A. Hafizh, “An Integrated AHP-TOPSIS Framework For Determination of Leading Industrial Sectors,” Jurnal Sistem dan Manajemen Industri, vol. 5, no. 2, pp. 115-124, 2021.

M. Fajri, R. R. M. Putri dan L. Muflikhah, “Implementasi Metode Fuzzy Analytic Hierarchy Process (F-AHP) Dalam Penentuan Peminatan di MAN 2 Kota Serang,” Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer, vol. 2, no. 5, pp. 2109-2117, 2018.

A. T. Gumus, “ Evaluation of Hazardous Waste Transportation Firms by Using a Two Step Fuzzy-AHP and TOPSIS Methodology,” Expert Systems with Applications, vol. 36, pp. 4067-4074, 2009.

Published
2024-06-12
How to Cite
[1]
Emi Rusmiati, Siti Aisyah, and Laksmi Ambarwati, “Quality Improvement Project Selection Using Fuzzy AHP and TOPSIS to Support Lean Six Sigma at PT ABC”, JI, vol. 9, no. 1, pp. 197-203, Jun. 2024.