Analysis of Operators Physical and Mental Workload at Thresher Station at PT. Beurata Subur Persada (Bsp) Nagan Raya

  • Said Al Ahsan Universitas Teuku Umar
  • Nissa Prasanti Universitas Teuku Umar
Keywords: Physical Workload, Mental workload, Operator, CVL

Abstract

PT Beurata Subur Persada (BSP) is a company engaged in processing Fresh Fruit Bunches (FFB) into Crude Palm Oil (CPO) located in Nagan Raya District, Aceh Province. In carrying out the production process, the thresher station is one of the stations in the factory that functions as a machine that ejects fruit from the stage of the jongkos (palm stalk) by slamming the FFB into the thresher drum successively. However, based on initial observations, it is known that the BSP operator who controls the thresher machine also controls other machines, so this increases the physical and mental workload of the operators. The purpose of this study was to analyze the physical workload and mental workload of station operators using the %CVL method and the NASA-TLX method which are influenced by the subjectivity of the operators. The results of the study found that there were 2 operators who experienced rather high physical workloads, while the other 2 operators experienced moderate physical workloads. While measuring the mental workload it is known that all operators are in the moderate category.

Downloads

Download data is not yet available.

References

A. Maretno and Haryono, “Analisa Beban Kerja Fisik dan Mental dengan Menggunakan Work Sampling dan NASA-TLX Untuk Menentukan Jumlah Operator Analysis Physical and Mental Workload Uses Work Sampling and NASA-TLX To Decide Operator Number,” Din. Rekayasa, vol. 11, no. 2, pp. 54–62, 2015.

N. Nurhayani, “Pengukuran Beban Kerja Pada SDM Operator Produksi Dengan Metode Cardiovascular Load (Cvl) Dan NASA-TLX,” Media Nusant., vol. XVIII, no. Cvl, pp. 29–36, 2022.

F. Setyaning Handika, E. Indah Yuslistyari, and ruf Hidayatullah, “Analisis Beban Kerja Fisik Dan Mental Operator Produksi Di Pd. Mitra Sari,” J. InTent, vol. 3, no. 2, pp. 82–89, 2020.

R. A. M. Puteri and Z. N. K. Sukarna, “ANALISIS BEBAN KERJA DENGAN MENGGUNAKAN METODE CVL DAN NASA-TLX DI PT. ABC,” Spektrum Ind., vol. 15, no. 2, pp. 211–222, 2017.

S. Heriyanti and T. M. A. Pandria, “Analisis Perawatan Mesin Sterilizer Menggunakan Metode Overall Equipment Effectiveness Di PT Surya Panen Subur II,” vol. 19, no. 2, pp. 289–294, 2022.

Y. Hidjrawan, “Pengukuran Beban Kerja Operator Boiler Berdasarkan Denyut Nadi,” vol. 8, no. 1, pp. 106–110, 2022.

J. Samosir and S. Sofiyanurriyanti, “Analisis Beban Kerja Operator pada Stasiun Boiler Menggunakan Cardiovascular Load (CVL) (Studi Kasus: PT. Socfindo Indonesia Perkebunan Seunagan),” J. Optim., vol. 8, no. 1, p. 119, 2022, doi: 10.35308/jopt.v8i1.4680.

V. M. Afma, “Analisa Beban Kerja Operator Inspeksi Dengan Metode NASA-TLX (Task Load Index) Di PT. XYZ,” Profisiensi, vol. 4, no. 2, pp. 118–122, 2016.

A. Hakiim, W. Suhendar, and D. Agustina Sari, “Analisis Beban Kerja Fisik Dan Mental Menggunakan Cvl Dan Nasa-Tlx Pada Divisi Produksi Pt X,” Barometer, vol. 3, no. 2, pp. 142–146, 2018, doi: 10.35261/barometer.v3i2.1396.

Published
2023-01-24
How to Cite
[1]
Said Al Ahsan and N. Prasanti, “Analysis of Operators Physical and Mental Workload at Thresher Station at PT. Beurata Subur Persada (Bsp) Nagan Raya”, JI, vol. 8, no. 1, pp. 14-19, Jan. 2023.