[1]
Yusuf Andika and Muhammad Arifin 2025. Design and Construction of 5 Kw Capacity Pelton Turbine in Pertegi Village, Pungga Hall, Parmonangan District, North Tapanuli. Jurnal Inotera. 10, 2 (Dec. 2025), 437-443. DOI:https://doi.org/10.31572/inotera.Vol10.Iss2.2025.ID468.